Последние новости компании
Tecon was awarded with a Conceptual Study and FEED for a new process water reinjection system in Pakistan.
Replacement of the old, existing cooling towers – this is OMV Petrom’s strategy to technically improve the cooling system and to reduce the maintenance costs. Considering the actual precarious state of the cooling water system afferent to the Petrochemical area, the Energo area and the FCC (Fluid Ca...
By the end of November 2007, TECON Engineering founded a 100 percent subsidiary registered in Ploiesti, Romania. The increasing demand for highly skilled personnel and OMV’s acquisition of a majority stake in the Romanian oil company Petrom induced TECON to found its own subsidiary in Romania. With...
On 30.11.2007 at 19:40 the SNOX plant operated without interruption for the first time. Exactly 28 hours and 20 minutes before schedule. This marked the end of a 20-month marathon for the “contracting partnership ILF – Envirgy – Tecon. “
The SNOX plant was designed and erected in the OMV refinery S...
During an inspection of the suspended ceiling in the dining hall at the OMV refinery, Schwechat, it was established that it was in danger of falling. TECON Engineering GmbH was commissioned to design and build a temporary dining hall so that operation of the company restaurant could be maintained.
...
On 1 October OMV Aktiengesellschaft, central Europe’s leading oil and gas company, opened the first super ethanol E85 filling station in Austria at the Avanti Station Guldengasse 14 in the 14th district of Vienna. E85 is a blended fuel made up of up to 85% bio ethanol and 15...
The IAESTE company fair is the biggest career fair for technicians in Austria. The company fair has been very successfully organized by IAESTE for more than 15 years. The proximity to students and ever more new innovations speak for the fair, which so far has always taken place twice a year.
On 24...
Displaying results 1 to 7 out of 11
|